Waste Management Model City
Current Permit Documents
6 NYCRR Part 373 Sitewide Permit – August 5, 2005
Current Sitewide Permit Reference Documents
- Meteorological Monitoring Network – QAPP - (pdf, 928kb)
- Financial Assurance Instruments
- Standby Letter of Credit - (pdf, 125kb)
- Surety Bond - (pdf, 125kb)
- Standby Trust Agreement - (pdf, 176kb)
- Process and Instrumentation Diagrams (P&IDs) - (pdf, 3MB)
- Above Ground Ancillary Equipment - (pdf, 51kb)
- Groundwater Sampling and Analysis Plan (GWSAP) - (pdf, 47MB)
- Groundwater Extraction Systems O & M Manual - (pdf, 104kb)
- Aqueous Wastewater Treatment System O & M Manual - (pdf, 3MB)
- Stabilization Facility O & M Manual - (pdf, 60kb)
Current Residuals Management Unit No. 1 (RMU-1) Documents
- Engineering Report - (pdf, 26MB)
- Operations & Maintenance Manual - (pdf, 2MB)
- Leachate Level Compliance Plan - (March 2010, pdf 14MB)
- Leachate Level Compliance Plan - (November 2011, pdf 15MB)
Permit Renewal Documents
Draft Permit Renewal Documents Incorporated by Reference
- Meteorological Monitoring Network - QAPP
- Site-Wide and RMU-1 Closure, Post-Closure, and Corrective Measures Cost Estimate Cost Estimates
- Site-Wide and RMU-1 Closure, Post-Closure, and Corrective Measures Cost Estimate Details
- Irrevocable Standby Letter of Credit #SM203351W
- Surety Payment Bond #RLB0003207
- Oak Brook Bank Standby Trust Agreement
- Groundwater Extraction Systems O&M Manual
- Process & Instrumentation Diagrams (PIDs) for Tank Systems
- Aboveground Ancillary Equipment Without Secondary Containment
- Aqueous Waste Treatment System O&M Manual
- O&M Manual for the Stabilization Facility
- RMU-1 Engineering Report
- RMU-1 O&M Manual
- RMU-1 Leachate Level Compliance Plan (LLCP) (March 2010)
- RMU-1 Leachate Level Compliance Plan (LLCP) (November 2011)
- Groundwater Sampling and Analysis Plan (GWSAP)
- Statement of Basis, Selection of Final Corrective Measures, CWM Chemical Services, L.L.C.
- Design Report for Process Area III Groundwater Interceptor Trench
- Design Report for Process Area IV Extraction Wells
- Site Radiological Survey Plan (SRSP)
- Sitewide Radiological Investigation Soil Sampling Plan (SRISSP)
- Radiation Environmental Monitoring Plan (REMP)
- Revised Radiation Environmental Monitoring Plan (REMP)
- Generic Small Project Soil Excavation Monitoring and Management Plan (GSPSEM&MP)
- Facultative Pond 8 Water Transfer Procedure
- Dioxin Management Plan
- RMU-1 Final Cover Access Road Design Plans
- RMU-1 Supplemental Primary Leachate Pumping System Design and Operational Plan